Technical Hub
Tools and references for consultants, engineers and contractors specifying HydraStorm products on Western Australian projects.
Embodied carbon avoided
3,222.53t CO₂e
Estimated product-stage CO₂e avoided versus Class 2 concrete pipe — running total.
Embodied carbon calculator
Compare HydraStorm rHDPE with a selected Class 2 concrete pipe option using published A1–A3 EPD data.
1. Select the concrete alternative
* Range-average option uses Class 2 pipe weights with a published mixed-class EPD factor.
2. Enter the required installed metres
| Pipe diameter | Required metres | HydraStorm kg CO₂e/m | Concrete kg CO₂e/m | HydraStorm t CO₂e | Concrete t CO₂e | CO₂e difference (t) |
|---|---|---|---|---|---|---|
| DN300 | 7.59 | 21.73 | 0.000 | 0.000 | 0.000 | |
| DN375 | 12.01 | 29.75 | 0.000 | 0.000 | 0.000 | |
| DN450 | 17.94 | 41.36 | 0.000 | 0.000 | 0.000 | |
| DN525 | 24.19 | 51.92 | 0.000 | 0.000 | 0.000 | |
| DN600 | 31.56 | 63.01 | 0.000 | 0.000 | 0.000 | |
| Total / project result | 0 | 0.000 | 0.000 | 0.000 |
- Project CO₂e reduction
- 0.000 t CO₂e
- Percentage lower
- —
- Total metres assessed
- 0
3. Total product-stage footprint (A1–A3)
- HydraStorm rHDPE
- 0.000 t CO₂e
- Selected concrete option
- 0.000 t CO₂e
- Embodied carbon avoided
- 0.000 t CO₂e
Method: installed metres × published pipe mass per metre × published A1–A3 GWP factor. Results are a product-stage screening comparison only; transport, installation, use and end-of-life are excluded. Same DN does not by itself establish structural or hydraulic equivalence.
Cover design calculator
HydraStorm cover design for buried pipe. Check cover under road or rail loading. Confirm site loads and embedment with your project engineer.
Unlock your cover design report
Enter your work email to unlock the cover design report. For consultants, engineers and contractors.
Check the cover inputs and try again.
Cover Design - AS2566.1
Project Details
- Location:
- Asset Owner:
- Designed By:
- Date:
- Revision:
Load Details
- Ballast Depth
- Ballast Unit Weight
- Soil Unit Weight:
- Critical Load Case (min cover):
- Design Load at Crown (min. cover):
- Critical Load Case (max cover):
- Design Load at Crown for the Max cover:
Cover Details
- Effective Combined Soil Modulus:
- Pipe Diameter
- Factor-of-Safety
- Minimum Cover Height
- Maximum Cover Height
Factor-of-safety is less than 2.5
Assumptions
Internal pressure (i.e. due to pressurised water mains or sewers) are not considered
The pipe is installed to the requirements of AS2566.2.
Questions? sales@hydrastorm.com.au · 1300 934 880