Contact Us
Home/Projects/Waikiki Outfall

Waikiki Outfall

HydraStorm was engaged by TRACC Civil to deesign and supply an alternative infiltration solution for one of their upcoming projects

Waikiki outfall unit

Project details

Client

Aaro Group

Location

Waikiki

Project Duration

1 month

Project Start

December 2022

Project Finish

January 2023

Description

HydraStorm was engaged by TRACC Civil to deesign and supply an alternative infiltration solution for one of their upcoming projects

With support from our business partners at Frankische, We were ablee to design an up-spec infiltration solution.

Each fitted with two Quadro Control shafts to enable future inspection and maintenance across the lifetime of the tanks.

  • 3,334 Rigofill ST-B Cubes
  • 760 Rigofill ST-B Sidewalls
  • 8 Quadro Control Shafts ST-B
  • 3,600m2 Geotextile

Facts & Figures

Total footprint 1,072m2

  • Tank 1 – L 24m x W: 9.6m x H: 1.32m – Gross Volume: 304.1 3m3, Net Volume: 291.96m3
  • Tank 2 – L: 30,4m x W: 8m x H: 1.32m – Gross Volume: 321.02m3, Net Volume: 308.18m3
  • Tank 3 – L 30.4m x W: 8m x H: 1.32m – Gross Volume: 321.02m3, Net Volume: 308.18m3
  • Tank 4 – L 29.6m x W: 12m x H: 1.32m – Gross Volume: 468.86m3, Net Volume: 450.11m3

Gallery

Waikiki outfall unit
Waikiki outfall unit
Waikiki outfall site

Contact Us

HydraStorm thrives on delivering the right solution for the right application, please contact our sales office for the right solution.