Description

RCP Pipeline Conversion to DN600 Multi-Bank Corrugated Pipeline.

 

Project Overview:

As part of the development of a new haul road, Evolution Mining required a robust underground pipeline solution capable of supporting extreme load conditions. The haul road would be a critical transport corridor for fully loaded quad road trains moving materials regularly across the mine site.

To ensure long-term performance under heavy traffic and variable site conditions, Evolution Mining partnered with Hydra Storm to design a multi-bank DN600 corrugated pipeline system. The project demanded a durable and efficient solution that could be delivered within tight timeframes and align with the overall haul road construction schedule.

 

Products:

  • 600 SN8 Hydra Storm rHDPE Corrugated RRJ 5.901m

 

Challenges:

  • Extreme Load Bearing: The pipeline would be installed beneath a brand-new haul road subject to constant use by fully loaded quad road trains, necessitating a high-load-capacity design.
  • Design for Longevity: As part of a new infrastructure investment, the solution had to offer minimal maintenance requirements and long-term resilience.
  • Time-Sensitive Execution: Installation had to synchronise with haul road construction timelines to avoid delays in road commissioning.

 

Solution Provided by Hydra Storm:
Hydra Storm delivered a tailored multi-bank DN600 corrugated pipeline system, engineered specifically to handle the operational demands of a high-traffic mining corridor. Key aspects of the solution included:

  • Corrugated Pipe Performance: The DN600 corrugated pipes offered exceptional structural integrity and flexibility, ideal for dispersing the load impacts from frequent heavy vehicle traffic.
  • Multi-Bank Configuration: The use of multiple parallel pipes increased flow capacity and distributed load stress more evenly, enhancing overall system performance.
  • Efficient Installation: Hydra Storm’s streamlined installation approach minimised disruption to the haul road construction schedule, ensuring timely project delivery.

 

Results:

  • Load-Bearing Success: The installed pipeline has met all performance expectations, reliably supporting quad road train traffic with no compromise to structural integrity.
  • Infrastructure Readiness: The pipeline installation was completed on schedule, allowing the haul road to be commissioned on time and without incident.
  • Client Satisfaction: Evolution Mining commended Hydra Storm for their responsive approach, technical expertise, and seamless project execution.

 

Conclusion:

Hydra Storm’s successful delivery of a multi-bank DN600 corrugated pipeline beneath Evolution Mining’s new haul road underscores its capability to design and implement heavy-duty drainage infrastructure in demanding mining environments. By combining innovation with practical execution, Hydra Storm helped enable a critical logistics route for one of Australia’s leading mining operators.

Summary

$300k

Client
Evolution Mining
Location
Kalgoorlie
Project Duration
5 months
Project Start
January 2025
Project Finish
May 2025

Gallery

Evolution Mining_Haul Road
Evolution Mining_Haul Road
Evolution Mining_Haul Road
Evolution Mining_Haul Road
>
Featured Modal Image

Contact Us

Hydra Storm thrives on delivering the right solution for the right application, please contact our sales office for the right solution.

Leave a Reply

Your email address will not be published. Required fields are marked *