Details
Description
RCP Pipeline Conversion to DN600 Multi-Bank Corrugated Pipeline.
Project Overview:
As part of the development of a new haul road, Evolution Mining required a robust underground pipeline solution capable of supporting extreme load conditions. The haul road would be a critical transport corridor for fully loaded quad road trains moving materials regularly across the mine site.
To ensure long-term performance under heavy traffic and variable site conditions, Evolution Mining partnered with Hydra Storm to design a multi-bank DN600 corrugated pipeline system. The project demanded a durable and efficient solution that could be delivered within tight timeframes and align with the overall haul road construction schedule.
Products:
- 600 SN8 Hydra Storm rHDPE Corrugated RRJ 5.901m
Challenges:
- Extreme Load Bearing: The pipeline would be installed beneath a brand-new haul road subject to constant use by fully loaded quad road trains, necessitating a high-load-capacity design.
- Design for Longevity: As part of a new infrastructure investment, the solution had to offer minimal maintenance requirements and long-term resilience.
- Time-Sensitive Execution: Installation had to synchronise with haul road construction timelines to avoid delays in road commissioning.
Solution Provided by Hydra Storm:
Hydra Storm delivered a tailored multi-bank DN600 corrugated pipeline system, engineered specifically to handle the operational demands of a high-traffic mining corridor. Key aspects of the solution included:
- Corrugated Pipe Performance: The DN600 corrugated pipes offered exceptional structural integrity and flexibility, ideal for dispersing the load impacts from frequent heavy vehicle traffic.
- Multi-Bank Configuration: The use of multiple parallel pipes increased flow capacity and distributed load stress more evenly, enhancing overall system performance.
- Efficient Installation: Hydra Storm’s streamlined installation approach minimised disruption to the haul road construction schedule, ensuring timely project delivery.
Results:
- Load-Bearing Success: The installed pipeline has met all performance expectations, reliably supporting quad road train traffic with no compromise to structural integrity.
- Infrastructure Readiness: The pipeline installation was completed on schedule, allowing the haul road to be commissioned on time and without incident.
- Client Satisfaction: Evolution Mining commended Hydra Storm for their responsive approach, technical expertise, and seamless project execution.
Conclusion:
Hydra Storm’s successful delivery of a multi-bank DN600 corrugated pipeline beneath Evolution Mining’s new haul road underscores its capability to design and implement heavy-duty drainage infrastructure in demanding mining environments. By combining innovation with practical execution, Hydra Storm helped enable a critical logistics route for one of Australia’s leading mining operators.
Summary
$300k
Client
Location
Project Duration
Project Start
Project Finish
Gallery




Contact Us
Hydra Storm thrives on delivering the right solution for the right application, please contact our sales office for the right solution.