Perforated Pipe

Alcoa – Pinjarra Refinery

Read More Carrot icon
graphic graphic

Details

Description

Hydra Storm was engaged by TRACC Civil to deesign and supply an alternative infiltration solution for one of their upcoming projects

With support from our business partners at Frankische, We were ablee to design an up-spec infiltration solution.

Each fitted with two Quadro Control shafts to enable future inspection and maintenance across the lifetime of the tanks.

Products

  • 3,334 Rigofill ST-B Cubes
  • 760 Rigofill ST-B Sidewalls
  • 8 Quadro Control Shafts ST-B
  • 3,600m2 Geotextile

Facts & Figures:

  • Tank 1 – L 24m x W: 9.6m x H: 1.32m – Gross Volume: 304.1 3m3, Net Volume: 291.96m3
  • Tank 2 – L: 30,4m x W: 8m x H: 1.32m – Gross Volume: 321.02m3, Net Volume: 308.18m3
  • Tank 3 – L 30.4m x W: 8m x H: 1.32m – Gross Volume: 321.02m3, Net Volume: 308.18m3
  • Tank 4 – L 29.6m x W: 12m x H: 1.32m – Gross Volume: 468.86m3, Net Volume: 450.11m3
  • Total footprint 1,072m2
Summary

$250k

Client
Alcoa
Location
Pinjarra
Project Duration
1 month
Project Start
October 2024
Project Finish
November 2024

Gallery

>
Featured Modal Image

Contact Us

Hydra Storm thrives on delivering the right solution for the right application, please contact our sales office for the right solution.

Leave a Reply

Your email address will not be published. Required fields are marked *